Contact Us

Product UPS System On Line UPS Numeric Make 3 KVA 1:1 Phase On-Line UPS with 180-200 Minutes Back up
Numeric Make 3 KVA 1:1 Phase On-Line UPS with 180-200 Minutes Back up

UPS System On Line UPS

Price: 85340

MRP 156668.5 You save 71328.5

Output Capacity 3 Kva
Output Phase 1 Phase
Input Phase 1 Phase
Full Load Backup 180-200 Minutes
Back up at 50% Load 360-400 Minutes
Battery DC Bus 96- Vdc
Flexible Battery Option No
Battery Capacity (VAH) 9600 Vah
Maximum Charger Capacity Amp.
Warranty for UPS 24 Month(S)
Warranty for Battery 24 Month(S)
Isolation Transformer Optional
Paralleling Options Optional
Rack Mountable No
Rack Mounting Kit No
Battery Rack Yes
Battery Interlink Connectors Yes
Batteries Positioning External
Cabling 5 Meters For Input and Output Yes
Paralleling kit for synchronising Optional

Reset default

Item Image Item Name Model No. HSN Code Quantity Unit Price Total Price
Numeric Make 3 KVA On-Line UPS With Isolation Transformer
Numeric Make 3 KVA On-Line UPS With Isolation Transformer

HPMAX- FMI-3K-96V

85049090

1

0

SMF Batteries 12V-100AH
SMF Batteries 12V-100AH

SMF12V-100 AH

85072000

8

10048

80384

Battery Rack for 08 Nos. 12 V-100 AH Batteries
Battery Rack for 08 Nos. 12 V-100 AH Batteries

BR10008

73269099

1

2832

2832

Interlink Connector for 3 KVA UPS - 96 V DC
Interlink Connector for 3 KVA UPS - 96 V DC

IC-3K-96V

85366990

1

2124

2124

Grand Total
85340

Similer Product

Item Image Item Name Price
Numeric Make 3 KVA 1:1 Phase On-Line UPS with 90-100 Minutes Back up

42530

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 120-140 Minutes Back up

56708

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 180-200 Minutes Back up

85340

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 60-70 Minutes Back up

29888

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 90-100 Minutes Back up

42530

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 120-140 Minutes Back up

56708

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 30-40 Minutes Back up

24020

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 60-70 Minutes Back up

29888

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 90-100 Minutes Back up

42530

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 120-140 Minutes Back up

56708

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 180-200 Minutes Back up

85340

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 30-40 Minutes Back up

24020

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 60-70 Minutes Back up

29888

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 90-100 Minutes Back up

42530

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 120-140 Minutes Back up

56708

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 180-200 Minutes Back up

85340

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 30-40 Minutes Back up

24020

Numeric Make 3 KVA 1:1 Phase On-Line UPS with 60-70 Minutes Back up

29888

Documentation

Item Catalogue
Numeric-MAX-FM-1kVA-F_1
pdf